ARIN-prop-318: Editorial Clean-up of NRPM Section 2.10

Date: 19 August 2022

Proposal Originators: Chris Tacit, Joe Provo, Matthew Wilder, Rob Seastrom

Editorial Clean-up of NRPM Section 2.10

Problem Statement

This proposal continues the work that the ARIN AC NRPM Clean-up Working Group undertook to conduct an editorial review of the NRPM. It relates specifically to Section 2.10. The focus of this proposal is to both clarify and simplify the wording of the section.

Policy statement

Replace the existing text: “The term End Site shall mean a single structure or service delivery address, or, in the case of a multi-tenant structure, a single tenant within said structure (a single customer location).” With the new text: “An End Point is the smallest non-divisible physical or virtual point in a network requiring IPv6 address space.”

Timetable for Implementation

Immediate

Anything Else

This proposal is intended to replace ARIN-prop-305 in part, but is not considered strictly editorial in nature.